Yes
1. Implementation through reference in the National Table of Frequency Allocations (Ministerial Order ITC/332/201 of 12th February 2010). <br> 2.Terminals are exempted from individual licensing on the condition that the system is under the control of a network operator, which requires a frequency authorisation from the Spanish Ministry of Industry, Tourism and Trade. <br> 3. Uplink transmissions in the bands 14.00 - 14.25 GHz and 29.5 - 30.0 GHz are limited to a maximum e.i.r.p. of 50 dBW
Yes
1. Implementation through reference in the National Table of Frequency Allocations (Ministerial Order ITC/332/2010 of 12th February 2010). <br> 2.Terminals are exempted from individual licensing on the condition that the system is under the control of a network operator, which requires a frequency authorisation from the Spanish Ministry of Industry, Tourism and Trade
Yes
For further details (call signs, equivalent licences, other specific requirements) consult Annex 2 of T/R 61-01
Yes
For further details (national licences corresponding to HAREC etc) consult Annex 2 of T/R 61-02