Published ↑ ↓ | Title ↑ ↓ | Description | Status | Download |
---|---|---|---|---|
2007-03-30 | CEPT Report 021 | "Technical considerations regarding harmonisation options for the Digital Dividend”. Compatibility issues between “cellular / low power transmitter” networks and “larger coverage / high power / tower” type of networks |
Active | |
2007-07-06 | CEPT Report 022 | "Technical considerations regarding harmonisation options for the Digital Dividend”. Technical Feasibility of Harmonising a Sub-band of Bands IV and V for Fixed/Mobile Applications (including uplinks), minimising the Impact on GE06 |
Active | |
2007-12-21 | CEPT Report 023 | "Technical considerations regarding harmonisation options for the Digital Dividend”. Technical Options for the Use of a Harmonised Sub-Band in the Band 470 - 862 MHz for Fixed/Mobile Application (including Uplinks) |
Active | |
2008-06-27 | CEPT Report 024 | "Technical considerations regarding harmonisation options for the Digital Dividend". A preliminary assessment of the feasibility of fitting new/future applications/services into non-harmonised spectrum of the digital dividend (namely the so-called "white spaces" between allotments) |
Active | |
2024-06-07 | ERC/REC 70-03 | ERC/REC 70-03 of 6 October 1997 on relating to the use of Short Range Devices (SRD) latest amended on 7 June 2024 (WG FM #107) |
Active |
|