Report from CEPT to the European Commission in response to the Mandate
“to develop least restrictive harmonised technical conditions suitable for next-generation (5G) terrestrial wireless systems for priority frequency bands above 24 GHz”
Harmonised least restrictive technical conditions for the 40.5-43.5 GHz frequency band